

















0 Recommend
A monolithic building under construction.
PRO
$7
Royalty free
| Platform: | 3dsMax 2017 + fbx |
| Render: | |
| Size: | 16 MBNEW |
| Polygons: | 300K |
| Colors: | |
| Length: | 32000 cm |
| Width: | 19000 cm |
| Height: | 30000 cm |
| Style: | Modern |
| Materials: | Metal, Concrete |
| Formfactor: |
Published 28 March 2025
A monolithic building under construction in three versions,
- during the installation of floor formwork
- during the installation of formwork for supports and partitions
- empty frame (long-term construction)
the building is in real size, the floor height is 2.7 m
- simple materials
- for medium and long shots
- in addition to the finished buildings, the file contains 4 types of individual floors for construction
buildings with the number of storeys you need
-Multi/Sub
- during the installation of floor formwork
- during the installation of formwork for supports and partitions
- empty frame (long-term construction)
the building is in real size, the floor height is 2.7 m
- simple materials
- for medium and long shots
- in addition to the finished buildings, the file contains 4 types of individual floors for construction
buildings with the number of storeys you need
-Multi/Sub
0 comments
A monolithic building under construction.
PRO
$7
Royalty free
33
| Platform: | 3dsMax 2017 + fbx |
| Render: | |
| Size: | 16 MBNEW |
| Polygons: | 300K |
| Colors: | |
| Length: | 32000 cm |
| Width: | 19000 cm |
| Height: | 30000 cm |
| Style: | Modern |
| Materials: | Metal, Concrete |
| Formfactor: |
Published 28 March 2025
A monolithic building under construction in three versions,
- during the installation of floor formwork
- during the installation of formwork for supports and partitions
- empty frame (long-term construction)
the building is in real size, the floor height is 2.7 m
- simple materials
- for medium and long shots
- in addition to the finished buildings, the file contains 4 types of individual floors for construction
buildings with the number of storeys you need
-Multi/Sub
- during the installation of floor formwork
- during the installation of formwork for supports and partitions
- empty frame (long-term construction)
the building is in real size, the floor height is 2.7 m
- simple materials
- for medium and long shots
- in addition to the finished buildings, the file contains 4 types of individual floors for construction
buildings with the number of storeys you need
-Multi/Sub
Are you sure you want to permanently delete the model?